Setting a machine down is the easy half. Getting it level and anchored is the part that matters.
A machine that is out of level does not fail immediately. It wears wrong, holds tolerance badly, and becomes somebody else’s problem six months later. We would rather spend the extra hour on the floor than have that conversation.
We set machines, install anchor bolts and baseplates, and put up bridge cranes, jib cranes and conveyor systems.
What we don’t do. We do precision levelling, not laser or optical alignment, and we do not do electrical work or machine commissioning. If your job needs those, you want a specialist — and we will say so before you book us rather than after.

Tell us what it is, roughly what it weighs, and how it has to come out. That is usually enough for a number.
585-266-7940Mon–Fri, 9:00–5:00
Get a quote